Question 1 of 2
0/2 answeredRead the question as text
In program testing, all lines become flat, as shown in the graph below. Which of the following is the testing status that can be surmised from this graph? Editorial accessible description of the original graph: The horizontal axis is Time. The left vertical axis is Number of test items; the right vertical axis is Number of bugs. The curve labelled Number of detected bugs rises and becomes flat. Number of unfinished test items decreases and becomes flat above zero. Number of unresolved bugs rises, falls, rises slightly, and becomes flat above zero. No numerical scale is printed.
The original image above preserves the complete textbook wording and layout.
Source: FE Vol 2.pdf, PDF page 309, textbook p. 305 · Information-technology Promotion Agency, Japan · First Edition: April, 2015. ID: tb-v2-c4-q8. Publisher answer and commentary · private review.